Home >
White Lodging Services

Cost: $2,300,000
Duration: 8 months
Completion Date: June 2007
Building Components: The project encompassed a 19,867 square foot, pre-engineered metal building with masonry fa?ɬßade for a two-story office area. The project also included an 8" concrete floor slab in the hangar, a snow melting system in the apron and a 120' x 28' hangar door. The hangar heating system is a specialized air rotation system.
Self-Performed Work:
|
|
site by ken kottke design
