Duchossois/Chicago Executive Airport

Duchisosis; VJS Lincoln, Inc., Milwaukee, WIWheeling, IL

 
Cost: $450,000

Completion Date: November 2011

Building Components:  

  • Hangar door replacement
  • Replaced existing 5 panel uni-directional door system with a 7 panel system
  • Installed 2 additional door rails
Please wait while we gather your results.

back to top
© 2019 VJS Lincoln, Inc.
This site is powered by the Northwoods Titan Content Management System